beautypg.com

Figure 8, Chapter 8: accessories – Grain Systems Tanks PNEG-4075G User Manual

Page 132

background image

Chapter 8: Accessories

6. Install the threaded stud (F) with stud nuts (G) to the end of the roof ring section (B).

NOTE: Install the threaded stud (F) to the side where the next roof ring section will be installed.

7. Repeat this process, installing each new roof ring section end onto the preceding threaded stud just

installed.

8. When all roof ring sections are installed, tighten each roof ring clip (B) to the recommended torque

specifications. See

Bolt Torque Specifications, page 24

.

9. Adjust each stud nut (G) outward, expanding each roof ring section. Continue this procedure evenly

until the roof ring raises the roof, showing a slight crown.

Figure 8-4 Exploded view of threaded stud

B

Exhauster roof ring section (CRP-
7229-XX)

6

G

Stud nut (S-8926)

F

Threaded stud (S-8765)

H

Cotter pin (not supplied)

132

Pneg-4075G 75 Ft Diameter 40-Series Bin

6.

(-XX) denotes the bin diameter.