Attaching the auger to the bin, Attaching the horizontal flight, Installation – Grain Systems Unload Augers PNEG-1556 User Manual
Page 12
3. Installation
12
PNEG-1556 8", 10" and 12" Commercial Vertical Drive Unit - Dual Drive
Attaching the Auger to the Bin
A. If the application requires an adapter plate, secure it to the bin unload tube before attaching the
vertical auger. Make sure that the adapter plate has a bolt located at 12 O’clock, when facing the
unload tube.
B. Raise the vertical auger and bolt the angle ring on the vertical auger to the angle ring on the
unload tube.
C. Adjust the feet at the bottom of the vertical auger to support the weight. See the table for the
appropriate minimum distance between the centerline of the unload tube and the ground.
D. Attach the inner support legs to the bin wall.
E. Adjust and tighten all the hardware for the support legs.
Attaching the Horizontal Flight
A. Slide the bin unload flight out through the vertical auger. In some applications the flight may have to
be unbolted from the center well.
B. Attach the horizontal head flight and bearing plate assembly with the appropriate hex bolts and
stover nuts.
Figure 3D
Minimum Ground Clearance
8"
17-1/4"
10"
19-7/8"
12"
18-3/8"
Flight Attachment Hardware Size
8"
Two (2) 7/16" x 3" Grade 8 Hex Bolts and Stover Nuts
10"
Two (2) 1/2" x 3-1/2" Grade 8 Hex Bolts and Stover Nuts
12"
Two (2) 5/8" x 4" Grade 8 Hex Bolts and Stover Nuts