beautypg.com

VEGA WEIGHTRAC 31 Foundation Fieldbus User Manual

Page 16

background image

16

4 Mounting

WEIGHTRAC 31 • Foundation Fieldbus

42375-EN-131120

1

2

3

4

2

5

6

Fig. 5: Mounting the crossbeam
1 Screws M10 x 40 (12 pcs.)

2 Wedge lock washer M10 Nordlock (24 pcs.)

3 Crossbeam (1 pce.)

4 Toe clamps (4 pcs.)

5 Nut M10 (12 pcs.)

6 Support stand (2 pcs.)

2. Place the four clamping claws (4) with the corrugation downwards

into the crossbeam (3).

3. Insert the screws (1) with one wedge lock washer (2) through the

clamping claws (4).

4. Place a wedge lock washer (2) from below on each screw (1) and

screw one nut (5) onto each screw.

5. Align the crossbeam (3) with the upper holding fixtures of the

support stands (6) and tighten the nuts (5) evenly with 45 Nm

(33.2 lb ft).

Mounting - Support stand

1. Place the premounted measuring frame above the conveyor belt

and determine a suitable position for mounting the support stands

(6).
Mount the measuring frame as well centered as possible and

at an angle of 90° above the conveyor belt. Keep enough lateral

distance to the conveyor belt.