5 Connecting to power supply and bus system
VEGAFLEX 83 • Modbus and Levelmaster protocol
41838-EN-130314
+
+
power supply
MODBUS
D0
D1
IS GND
USB
1
2
1
3
4
5
2
off on
( )
(
)
(-)
(-)
Fig. 16: Connection compartment
1 USB connection
2 Slide switch for integrated termination resistor (120 Ω)
Terminal
Function
Polarity
1
Voltage supply
+
2
Voltage supply
-
3
Modbus-Signal D0
+
4
Modbus-Signal D1
-
5
Function ground with installa-
tion according to CSA
5.4 Switch-on phase
After VEGAFLEX 83 is connected to the bus system, the instrument
carries out a self-test for approx. 30 seconds. The following steps are
carried out:
•
Internal check of the electronics
•
Indication of the instrument type, hardware and software version,
measurement loop name on the display or PC
•
Indication of the status message "F 105 Determine measured
value" on the display or PC
•
Status byte goes briefly to fault value
As soon as a plausible measured value is found, it is outputted to the
signal cable. The value corresponds to the actual level as well as the
settings already carried out, e.g. factory settings.