beautypg.com

High Lifter Max Clearance Series Trailing Arm Kit for Polaris RZR XP 900 User Manual

Page 8

background image

18. Connect the new sway bar extension bracket to the sway bar using the 10x50mm bolt and

10mm lock nut.

19. Connect the sway bar extension bracket to the sway bar link using the 10x55mm bolt and 10mm

lock nut.

20. Now attach the brake line to the new trailing arm by using the P-clamp and zip ties provided.

21. Attach the P-calm to the inside of the trailing arm, making sure the brake line does not get

pinched or cut during operation. There are two predrilled holes in the arms to attach the P-
calms and you attach them using the 6x8mm bolts and 6mm washers provided.