beautypg.com

Blue Ox BRK4000 User Manual

Page 3

background image

BRK4000

Push Cylinder BrakeSafe™

Installation Instructions

405-0312 Rev A

Page 3 of 6

9/27/13

3/8” Tubing Installation On Coach

3. Push the supplied 3/8” DOT tubing into the tee fitting or the pipe to tube fitting making sure it is bottomed

into the port. Route and secure the 3/8” DOT tubing making sure to route away from hot parts. Once you

get to the rear of the coach with the tubing, secure the Coach Mounting Bracket with 1/4”-20 x 1-1/4” bolts

and 1/4”-20 lock nuts in a convenient location on the bumper. Then mount the bulkhead fitting, 3/8 tube

fitting, and QD coupler to this mount bracket as shown in Figure 3. Cut the extra 3/8” DOT tubing off and

then push into the pipe to tube fitting.

1/4” Tubing Installation On Towed

4. Mount the Towed Vehicle Bracket with the 1/4”-20 x 1-1/4” bolts and 1/4”-20 lock nuts to the towed vehicle

in a convenient and secure location. Then mount the QD plug and 1/4” bulkhead to this bracket. Route the

1/4” tubing thru the driver side engine compartment making sure not to run tubing along hot parts. Push

tubing thru an existing grommet in the firewall. If there isn’t a hole, drill a new hole and install a grommet.

Continue routing the tubing behind driver side kick panel, then under the door sill molding. End the routing

under the driver seat, making sure to leave enough to hook-up to the push cylinder. Cut any excess off.

Self-Coil Hose

Male QD Fitting

Coach Mounting Bracket

Towed Vehicle Mounting Bracket

Female QD Coupler

Towards Coach

3/8" Tubing

Towards Towed Vehicle

1/4" Tubing

Figure 3