Chapter 2: control testing, Why run control tests, About the control solution – Accu-Chek Active User Manual
Page 19

17
Chapter 2: Control Testing
Why Run Control Tests
Control tests ensure that both the meter and the test strips are working properly and giving reliable results.
You should run a control test when:
•
The meter is new
•
You open a new box of test strips
•
You leave the cap off of the test strip container
•
You want to check the performance of the meter
and test strips
•
You drop the meter
•
Your test results don’t agree with how you feel
•
You want to make sure you’re performing tests
correctly
About the Control Solution
•
Make sure you use only ACCU-CHEK Active
control solution.
•
When you first open the bottle, write the date on
the label – the control solution is good for three
months from that date or until the expiration
date on the bottle, whichever comes first.
•
Never use control solution that has expired.
•
Always close the control solution bottle tightly.
•
Store at room temperature, between 36-86°F
(2-30°C).