beautypg.com

Upstream power back-off (upbo) – ZyXEL Communications IES-5005 User Manual

Page 51

background image

IES-5000/5005/6000 Support Notes

50

Upstream Power Back-Off (UPBO)

What is UPBO?

Upstream Power back-of (UPBO) helps to run services over loops with different length

co-located in the same cable binder (“mixed length” deployments), especially in

FEXT-dominated noise environment.

Strong FEXT generated by short loops can significantly degrade the performance of long loops

if UPBO is not applied. On the other hand, UPBO reduces the transmit power of short loops

and thus degrades their performance as well.

PSD

PSD

PSD

PSD

PSD

f

f

f

f

f

Enable UPBO to allow the system to adjust the transmit PSD of all lines based on a reference

line length so that the PSD at the receiving end is the same.

PSD

PSD

f

f

PSD

f

PSD

f

PSD

f

All contents copyright (c) 2008 ZyXEL Communications Corporation.

This manual is related to the following products: