Riello burner set up sheet – Weil-McLain 800058000-Brn-PO Rie F5 User Manual
Page 15

3223
12
GB
BURNER ADJUSTMENT TABLE
NON-RETROFIT APPLICATIONS
If this burner is being installed in a packaged unit (i.e. Burner comes with a boiler or furnace), follow the instal-
lation and set-up instructions supplied with the heating appliance, as settings will differ from those shown in
this manual.
Note: Any approved oil burner nozzle type, angle and manufacturer maybe used, as long as input is corresponding the
correct BTU/hr. or US gph input rating of the appliance.
COMBUSTION CHAMBER
Follow the instructions furnished by the boiler/furnace manufacturer. Size retrofit application according to the appropri-
ate installation codes (e.g. CSA B139 or NFPA #31).
BURNER START-UP CYCLE
NOTE:
The above set up charts are a starting point only.
The burner and appliance must be properly set up using proper combustion testing equipment.
Normal
Lock-out, due to light-failure
Thermostat
Motor
Ignition transformer
Valve
Flame
Lock-out lamp
~
12s
~
12s
~
5s
D5229
8000-5800
8000-5900
C8512520
C8512521
Riello 40
Series
F5
F5 Factory
preset *1
F5 Factory
preset *1
F5 Factory
preset *1
Boiler
UO3
UO3
UO4
UO5
Input
GPH
0,8
1,0
1,2
1,4
Nozzle
Delavan
.65 X 70°B
.85 X 60°B
1.00 X 70°B
1.10 X 70°B
Pump Pressure
PSI
150
145
145
160
0
1
3
4
2.75 2.8 2.9 2.9
Air tube length
inches
8
8
8
8
Ait tube insertion
inches
4 1/4"
4 1/4"
4 1/4"
4 1/4"
*1 Nozzle pre-installed at factory.
Burner Model
Turbolator Setting
Air Gate Setting
C8512519
Weil McLain Part No.
Riello Part No.
RIELLO
BURNER SET UP SHEET
8000-5700