Fill the system:

1. Do not fill (except for leakage tests) until boiler

is ready to be fired.

2. Fill to normal water line as indicated on jacket

front panel.

3. Boiler water pH 7.0 to 8.5 is recommended.

Failure to maintain recom-

mended pH can cause section failure and

leaks.

Skim steam boiler:

Clean new steam boilers to remove

any impurities. Failure to properly clean can
result in violent water level fluctuations, water
passing into steam mains, or high maintenence
costs on strainers, traps or vents. Skim boiler
only. Do not clean old piping or leaks can occur.

Do not use petroleum-based

compounds in boiler system. Damage to
system components can result, causing property
damage.

1. Provide 1-1/2" skim piping from skim tapping

(located on front of boiler) to floor drain. Add a

tee in piping to observe skim water level. Raise

waterline to midpoint of skim tapping.

2. Fire burner to maintain water temperature

below steaming temperature during skimming

process.

3. Feed in water to maintain water level. Cycle

burner to prevent rise in steam pressure.

Continue skimming until discharge is clear.

4. While boiler is warm, but not hot, drain boiler

through drain valve.

5. Remove skim piping. Close drain valve. Fill

with fresh water to normal waterline. Start

burner and steam for 15 minutes to remove

dissolved gases. Stop burner.

6. Check traps and air vents for proper opera-

tion.

7. Process may need to be repeated after several

weeks of operation.

Detailed Service Procedures

To place in operation:

Follow information below to prevent

severe personal injury, death or substantial prop-
erty damage:

Do not use crankcase drainings or any oil

containing gasoline. See burner manual for

proper fuel oil.

Do not attempt to start burner when excess oil

has accumulated in combustion chamber,

when unit is full of vapor, or when combustion

chamber is very hot.

Do not start burner unless collector hood, flue

cap, jacket cap, breeching and burner mount-

ing door are secured in place.

Never burn garbage or paper in the boiler.

Never leave combustible material around

boiler.

1. Verify boiler is filled with water to normal

waterline as indicated on jacket front panel.

2. Open burner door and verify rear target wall,

floor and burner door insulations are in

proper condition and position.

3. Verify burner mounting door is closed and

bolted tightly and burner plug is connected.

4. Refer to burner manual for burner start-up,

adjustment and check-out procedures.

Factory burner adjustment and settings may

not be suitable for specific job conditions.


Make final burner adjustments

using combustion test equipment to assure

proper operation. Do not fire boiler without

water. Sections will overheat, damaging boiler

and resulting in substantial property damage.

5. Check boiler and system piping for leaks.
6. Inspect breeching and venting for proper

operation.

Part No. 550-141-830/1202