beautypg.com

Warning, Counterbalance cables and rollers, Vertical tracks – Wayne-Dalton TORQUEMASTER 9600 User Manual

Page 4: Top roller slides / top bracket, Operator bracket, Attach horizontal tracks to q.i. flag angles

background image

(2) 1/4”-14 X 5/8”

Self tapping screws

Viewing hole

1

2

3

4

U-bar

Roller side

Counterbalance Cables and Rollers

Tools: Tape Measure

7

NOTE: TorqueMaster® counterbalance cable drum assemblies are marked right and left hand.

WARNING

WARNING

fAILuRE TO ENsuRE TIGhT fIT Of CAbLE LOOP OvER MILfORD PIN COuLD

REsuLT IN CAbLE COMING Off ThE PIN, ALLOWING ThE DOOR TO fALL, POs-

sIbLy REsuLTING IN sEvERE OR fATAL INjuRy.

uncoil the counterbalance cables from the drum assemblies, making sure you place the left

hand cable loop on the left hand milford pin of the bottom bracket and the right hand cable loop

on the right hand milford pin of the bottom bracket.
NOTE: Check to ensure cable loops fits tightly over the milford pins.
Insert a roller into the bottom brackets and another into the #1 end hinges at the top of the

bottom section.
NOTE: Verify astragal (bottom seal) is aligned with door section. If there is more than 1/2”

excess astragal on either side, trim astragal even with door section.

bottom section

Tools: Level, Wooden shims (if necessary)

8

Center the bottom section in the door opening. level the section using wooden shims (if neces-

sary) under the bottom section.

vertical Tracks

Tools: Power Drill, 3/16” Drill bit, 7/16” Socket driver, Tape measure,

Level, Step ladder

9

IMPORTANT: THE TOPS Of THE VERTICAl TRACKS MuST BE lEVEl fROM SIDE TO SIDE. If

THE BOTTOM SECTIOn WAS SHIMMED TO lEVEl IT, THE VERTICAl TRACK On THE SHIMMED

SIDE MuST BE RAISED THE HEIGHT Of THE SHIM.
Position the left hand vertical track assembly over the rollers of the bottom section. Make sure

the counterbalance cable is located between the rollers and the door jamb. Drill 3/16” pilot holes

into the door jamb for the lag screws.
loosely fasten jamb brackets and flag angle to the jamb using 5/16” x 1-5/8” lag screws.

Tighten lag screws, securing the bottom jamb bracket to jamb, maintain 3/8” to 5/8” spacing

between the bottom section and vertical track. Hang cable drum over flag angle. Repeat for

other side.

stacking sections

Tools: Power drill,7/16” Socket driver

10

NOTE: Make sure hinges are flipped down, when stacking another section on top.
Place rollers into end hinges of remaining sections.
With assistance, lift second section and guide rollers into the vertical tracks. lower section until

it is seated against bottom section. flip hinges up. fasten intermediate hinge(s) first; then end

hinges using 1/4”-14 x 5/8” self tapping screws. Repeat for other sections, except top section.
Important: Push & hold the hinge leafs securely against the sections while securing with 1/4”-14

x 5/8” self tapping screws. There should be no gap between the hinge leafs and the sections.

Top Roller slides / Top bracket

Tools: Power drill, 7/16” Socket driver, Step ladder

11

If you recieved top roller slides:
To install the top roller slides, align the slots in the top roller slide with the second set of holes

on the bottom of the u-bar. loosely, fasten using (2) 1/4” - 14 x 5/8” self tapping screws. The

bracket will be tightened and adjusted in step Adjusting Top Roller Slide / Top Brackets. Insert

rollers into top roller slide. Repeat for left side.

If you recieved top brackets:
Align the top holes in the top bracket base with the second set of holes in the end cap of the top

section. fasten to section using (4) 1/4”-14 x 5/8” self tapping screws. Secure the top bracket

slide to the bracket base loosely using (2) 1/4”-20 x 5/8” carriage bolts and (2) 1/4”-20 flange

hex nuts. The bracket will be tightened and adjusted in step Adjusting Top Roller Slide / Top

Brackets. Insert roller into top bracket slide. Repeat for other side.

Roller Slide

Bottom Of

U-bar

Roller

(2) 1/4”-14 X

5/8” Self Tapping

Screw

Operator bracket

Tools: Power drill, 7/16” Socket driver, Phillips head screwdriver, Vice

clamps, Tape measure

12

NOTE: If you’re installing a trolley operator, the operator bracket must be mounted and secured

prior to installing top section.
IMPORTANT: WHEn COnnECTInG A TROllEY TYPE GARAGE DOOR OPEnER TO THIS DOOR, A

WAYnE-DAlTOn OPERATOR/ TROllEY BRACKET MuST BE SECuRElY ATTACHED TO THE TOP

SECTIOn Of THE DOOR, AlOnG WITH AnY u-BARS PROVIDED WITH THE DOOR. THE InSTAl-

lATIOn Of THE OPERATOR MuST BE ACCORDInG TO MAnufACTuRER’S InSTRuCTIOnS AnD

fORCE SETTInGS MuST BE ADjuSTED PROPERlY.
Prior to installing top section, locate the center of the top section and seat the operator bracket

on top of the top section. for retro fit applications, the operator bracket must be aligned with an

existing operator and positioned on top section so it bridges the transition point of the section

thickness. Install (2) #12 x 1/2” phillips head screws on the back side of operator bracket.

Clamp operator bracket to u-bar (if supplied) with vice clamps. Attach (5) 1/4” - 14 x 5/8” self-

tapping screws to the operator bracket. Remove vice clamps.
NOTE: If a u-bar was installed, you can use two of the 1/4” - 20 x 11/16” self-drilling screws

previously used to attach the u-bar instead of two 1/4”-14 x 5/8” self-tapping screws when

attaching operator bracket to u-bar.
NOTE: When attaching operator bracket to top section with u-bar, apply additional pressure to

thread into the u-bar.

(2) #12 x 1/2”

Phillips head screws

(5) 1/4”- 14 x 5/8”

Self-tapping screws

Top section

Tools: Hammer, Step ladder, Tape measure

13

Place the top section in the opening. Temporarily secure the top section by driving a nail in the

header near the center of the door and bending it over the top section. now, flip up the hinge

leaves, hold tight against section, and fasten center hinges first and end hinges last (refer

to step, Stacking Sections). Vertical track alignment is critical. Position flag angle between

1-11/16” (43 mm) to 1-3/4” (44 mm) from the edge of the door; tighten the bottom lag screw.

flag angles must be parallel to the door sections. Repeat for other side.
IMPORTANT: THE DIMEnSIOn BETWEEn THE flAG AnGlES MuST BE DOOR WIDTH PluS

3-3/8” (86MM) TO 3-1/2” (89 MM) fOR SMOOTH, SAfE DOOR OPERATIOn.
now complete the vertical track installation by securing the center jamb bracket(s), flagangle,

and connection of the vertical track/flagangle (if applicable). Repeat for other side.

Attach horizontal Tracks to Q.I. flag Angles

Tools: Ratchet wrench, 9/16” Socket, 9/16” Wrench, level, Step ladder

14

NOTE: If you have Q.I. flag angles, complete this step.
To install horizontal track, place the curved end over the top roller of the top section. Align key

slot of the horizontal track with the Q.I. tab of the flag angle. Push curved portion of horizontal

track down to lock in place.

4

Please Do not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer,

refer to your local yellow pages business listings or go to the find a Dealer section online at www.wayne-dalton.com

This manual is related to the following products: