Inspection/unpacking, Installation precautions, Conductor routing and grounding – Toshiba 1600 XP UPS User Manual
Page 2: Operating precautions
2
1600XP Series Quick Installation Guide
Inspection/Unpacking
Inspection
Upon receipt of the UPS, an inspection for shipping damage should be performed. Use caution when removing the unit from the
pallet. Refer to labels or documentation attached to packing material.
Unpacking
Check the unit for loose, broken, bent or otherwise damaged parts. If damage has occurred during shipping, keep all original
crating and packing materials for return to the shipping agent. The warranty does not apply to damage incurred during shipping.
Ensure that the rated capacity and the model number specified on the nameplate conform to the order specifications.
Installation Precautions
Install the unit in a well-ventilated location; allow at least 4 inches (10 cm) on all sides for air
1.
ventilation and for
maintenance.
Install the unit in a stable, level and upright position that is free of excessive vibration.
2.
Install the unit where the ambient temperature is within 32 – 104 °F (0 – 40 °C).
3.
DO NOT install the UPS in areas that are subject to high
4.
humidity.
DO NOT install the UPS in areas that allow exposure to direct sunlight.
5.
DO NOT install the UPS in areas that allow exposure to high levels of airborne dust, metal particles, or flammable
6.
gases.
DO NOT install the UPS in areas near sources of electrical noise. Ensuring a proper earth
7.
ground will reduce the effects
of electrical noise and will reduce the potential for electrical shock.
DO NOT install the UPS in areas that would allow fluids or any foreign object to get inside the UPS.
8.
The UPS generates and can radiate radio-frequency energy during operation. Although RFI noise filters are installed
9.
inside of the unit, there is no guarantee that the UPS will not influence some sensitive devices that are operating near
by. If such interference is experienced, the UPS should be installed farther away from the affected equipment and/or
powered from a different source than that of the affected equipment.
After ensuring that all power sources are turned off and isolated in accordance with established lockout/tagout procedures,
10.
connect the power source wiring of the correct voltage to the input terminals of the UPS.
Connect the output terminals of the UPS to the load (refer to NEC Article 300 – Wiring Methods and Article 310 –
11.
Conductors For General Wiring). Size the branch circuit conductors in accordance with NEC Table 310.16.
Conductor Routing and Grounding
Use separate metal conduits for routing the input power, output power, and control circuits.
1.
Follow the wire size and tightening torque specifications listed on page 4.
2.
Always ground the unit to reduce the potential for electrical shock and to help reduce electrical noise.
3.
A separate ground cable should be run inside the conduit with the input power, output power, and control circuits.
4.
THE METAL OF CONDUIT IS NOT AN ACCEPTABLE GROUND.
Operating Precautions
The UPS should not be used with a load that has a rated input that is greater than the rated output of the UPS.
1.
2.
DO NOT use the UPS to provide power to motors that require high starting current or with motors that require a long
starting time, such as vacuum cleaners/machine tools (oversizing the UPS for lock rotor current would be required).
DO NOT attempt to disassemble, modify, or repair the UPS. Repairs and servicing should only be performed by Toshiba
3.
Field Service personnel.
Access panels should be removed only by Toshiba Field Service personnel.
4.
Turn the power on only after installing ALL of the covers.
5.
If the UPS should emit smoke, produce an unusual odor, or make sound, turn the power off immediately.
6.