beautypg.com

Frame installation – Therma-Tru Smooth-Star User Manual

Page 7

background image

6

Check rough opening as follows and correct if necessary:

• Sub-floor to be flat, level, and clean. Sill must be supported throughout

its entire length.

• All four corners to be square. Check with a framing square.
• Framing and walls to be plumb. Use a 6-foot level to check both sides

of opening.

• All wall surfaces to be straight and sides parallel.
• Opening to be correct size. Allow 3/8 on sides and 1/2 at head.

"

"

Frame Installation

Wall

straight?

Wall

straight?

Check all four
corners with
square.

Check each
side both
ways.

Check floor
under sill.

This manual is related to the following products: