Installation, 1 unpacking stackmaster™tr 16-port equipment – Transition Networks STACKMASTER TR SMHB-TR-16 User Manual
Page 19

3. Installation
To install the StackMaster™TR 16-Port Active Retiming Managed Hub::
•
Unpack the StackMaster™TR Equipment
•
Stack Units in Rack or on Table
•
Cascade StackMaster™TR Units
•
Connect StackMaster™TR to Network
•
Connect Units to Power
•
Optionally Configure SNMP Network Management
3.1 Unpacking StackMaster™TR 16-Port Equipment
Use the packing contents lists to verify the shipment:
Item
Part Number
StackMaster Modular Chassis
SMHB-TR-16
Special 6-inch DB-25 data cable
6005
Power Cord
3344 (or refer to Appendix D)
User’s Guide
7361
3-1
USER’S GUIDE