beautypg.com

TAG CENTRIX SV-2000-X2 User Manual

Page 4

background image


Operation

Part

2.2

TAG’s en
rigorous
Compute
prototypi
met at ev
ensuring
to demon
througho

TAG prid
and facili
invested
TAG to t
the harsh
military s
and DO 1

TAG’s o
Highly A
Chamber
test cham
thermal t

• F

li

• A
• A

w

• D

in

TAG imp
art produ
TAG’s m
Manufac
operating
manufact

ns Manual

Number: 1

2 Core

C

ngineering m

design revie

er-Aided Des

ing processe

very step of t

all entrance

nstrate requir

out the design

des itself on

ities. Over t

in several pi

test and certi

hest environm

standards – i

160D.

nsite test equ

Accelerated L

r, an Electrom

mber, and a h

test chamber

loor plan de

ines

A dedicated 2

A modern pro
with external

Dedicated Qu

nspection

plements Ce

uction facility

manufacturin

turing. Con

g in isolation

turing opera

SV-20

1008080

ompetence

2.2.1 En

methodology
ews. Althou

sign (CAD)

es, and divers

the design. T

e and exit cri

rement comp
n process.

its engineer

the past thre

ieces of equi

ify products

mental requi

including the

uipment curr

Lifecycle Te

magnetic Int

high-/low-tem

r. TAG’s fac

esigned to su

24-hour syst

oduction stat

web collabo

uality Assura

2.2.2 Ma

llular Manu

y to minimiz

ng facility is
nsistent with

n; however p

ations, costs,

000-X2 Ser

Version

es

ngineering

y is built upo

ugh PMs driv

tools, Comp

se test equip

TAG Engine

teria are met

pliance, risk

ring laborato

e years, TAG

ipment that a

directly ons

rements of

e MIL-STD-

rently includ

esting (HALT

terference (E

mperature

cility also pr

upport a cellu

em burn-in r

tus tracking

oration capab

ance worksta

anufacturin

facturing pro

ze waste byp

physically p

the model, e

personnel an

and the prod

rver (CENT

1.4. 01/12/

on Multi-Dis
ve the schedu
putational Fl

pment and fa

eering follow

t at each stag

ks are mitigat

ories

G has

allow

site to

-810F

des a

T)

EMI)

rovides:

ular manufac

room

and Enterpr

bilities

ations for sy

ng and Inte

ocesses throu

products and

partitioned to

each of TAG

d tools are s

duction/integ

TRIX /

JHS

/2010

sciplinary Op

ule at TAG,

uid Dynami

acilities to en

ws a proven

ge. Rigorou

ted, and dec

cturing mode

rise Resource

ystem compli

egration

ugh our com

d maximize p

o model the m

G’s productio

hared across

gration sche

SV)

P

ptimization (

Engineering

cs (CFD) mo

nsure require

design-revie

us documenta

isions are pr

el with modu

e Planning (E

iance and va

mpartmentali

production e

major philos

on cells are c
s all cells to

dule. TAG’

Page 4 of 8

(MDO) and

g leverages

odels, rapid

ements are b

ew process,

ation is com

rudent –

ular assembl

ERP) system

alidation

ized, state-of

efficiency.

sophies of L

capable of

streamline

’s floor

82

eing

mpiled

ly

m

f-the-

ean