Procedures – TAG CENTRIX SV-2000-X2 User Manual
Page 30

Operations Manual
SV-2000-X2 Server (CENTRIX /
JHSV)
Part Number: 1008080
Page 30 of 82
Version 1.4. 01/12/2010
6
Procedures
The procedures within this Chapter contain
relevant information to ensure your SV-2000-
X2 Server maintains its maximum performance
potential.
6.1 Server
Startup
1. Check to make sure that all the cables are
seated and connected correctly to the back of
the unit such as keyboard, mouse, monitor
VGA cable and both power cables.
2. Then Press the power switch ON to start the
computer (power switch is located in the front
of the unit)
3. Once the unit starts, System will go thru Power
On self Test (POST) (no action is required at
this time)
4. At windows dialog box press Ctrl, Alt, Delete
at once to login
5. Type in the correct user name and password
and then press enter to login
6. Once the operator is logged on to the unit they
could use the computer as they wish.
NOTE: Assuming the Server is not
connected to any network.
6.2 Server
Shutdown
1. The operator needs save any data that is
needed to be saved and then close application
2. Once all data is save and applications are
closed, click on Start menu, select shutdown
and then click OK to shutdown the computer.
6.3 Identifying Server Components Using Device Manager
The Device Manager is one of Windows' most
useful diagnostic tools. It lets you see all of the
devices attached to your computer, and which
resources they are each using. To access the
Device Manager do the following: