Concentric riser vent kit installation cont – QHT Boiler User Manual
Page 8

Concentric Riser Vent Kit Installation Cont.
Intake Gasket Installation :
Install the intake gaskets (E) on the intake
pipes as shown in Figure 6.
Figure 6
Figure 7
Vertical Rise Installation :
• Install the flange gasket (F) onto the boiler
outlet as shown in Figure 7.
• Attach the boiler collar (H) to the outlet of
the boiler using the 4 screws (G).
• Insert the vertical exhaust pipe (C) into
the boiler collar. (Be careful not to
damage the red exhaust gasket)
• Slide the air intake pipe (D) onto the boiler
collar so that the intake gasket (E) fits
over the intake collar (H).
• Install the elbow (J) onto the vertical rise
pipe.
Intake Pipe Clamp Installation :
Install the intake pipe clamps (B) on the intake
gaskets (E) as shown in Figure 8, using
attachment screws (I)
Figure 8
8
Figure 9
Termination Installation :
• Install the wall gaskets (M) on the
termination pipe (K). One gasket from the
inside of the wall and one from the
outside.
• Install the intake gasket (E) on the
termination pipe (K)