Standard concentric vent kit installation – QHT Boiler User Manual

Page 11

background image

Standard Concentric Vent Kit Installation

Pipe connections (Figure 1):
Whenever joining concentric pipe cut the inner
exhaust pipe so it is 1 inch long than the outer
intake pipe.

Figure 1

Figure 2

Termination Location / Installation:
The concentric termination piece is installed
by sliding the outer intake pipe through the
wall from inside the building (shown in figure
2). The inner exhaust pipe is then slid into the
intake pipe until the termination cap bottoms
out on the end of the intake pipe.

Note: The termination should be pitched 3°
downward (2” down per 39” length) away from
the boiler. As shown in Figure 3.

Concentric Vent Kit components :
Figure 4 depicts the standard concentric vent
kit components and dimensions. The
horizontal termination can be cut to length
(from the male end) during installation.
Additional pipe or elbows can be purchased
separately. Refer to page ? for the relevant
part numbers.

Figure 4

11

Exhaust Gasket Installation :
Install the red exhaust o-ring gaskets (E) into
each of the vent component female ends as
shown in Figure 5. Be sure to install the
gaskets so the beveled rings are oriented as
shown in Figure 5.

Figure 5

Figure 3

3° Downward pitch
(2” per 39” length).

Away from boiler

6”

1/8”

3 3/4”

6”

34 3/4”

37 1/2”