beautypg.com

Raypak 0180B User Manual

Page 30

background image

6. Remove combustion chamber clips at the four

corners of the heat exchanger.

7. Lift heat exchanger straight up using caution not to

damage refractory.

HEAT EXCHANGER RE-ASSEMBLY

1. Heat exchanger water header O-rings should be

replaced with new ones.

2. Install inlet-outlet and return water headers and

install header retainer nuts and torque nuts evenly.

3. Replace "V" baffles.

4. Install thermostat sensing bulbs in header wells

and replace bulb retaining clips.

5. Install inlet and return pipes in water headers using

pipe thread sealant.

6. Install water pressure relief valve, flow switch, and

low water cutoff devices if so equipped.

7. Open water supply and return shut-off valves. Fill

boiler and water piping system with water. Check

boiler and piping system for leaks at full line pres-

sure. Run system circulating pump for a minimum

of 1/2 hour with boiler shut-off.

8. Shut down entire system and vent all radiation units

and high points in system piping. Check all strain-

ers for debris. Expansion tank water level should

be at the 1/4 mark and the balance of the tank filled

with air (when using Air-X-Tank).

9. Install flue collector, jacket top and inspection pan-

els. Install top holding screws. Install draft diverter

and vent piping if so equipped.

10. If gas piping was disconnected, reconnect gas

piping system and check for leakage using a soap

solution.

11. Check for correct water pressure and water level in

the system. Make sure that system pump operates

immediately on the call for heat. The system is

ready for operation.

13. Within two (2) days of start-up, recheck all air vents

and expansion tank levels.

COMBUSTION CHAMBER REMOVAL

To remove combustion chamber you must first

have removed the heat exchanger. Unbolt metal com-

bustion chamber retainer from top and remove com-

bustion chamber panels individually.

30

This manual is related to the following products: