Dielectric strength (hipot) testing, Figure 14: dielectric strength (hipot) testing, 3 dielectric strength (hipot) testing – RuggedCom RS416 User Manual
Page 21

Installation
21
RuggedCom
®
RuggedServer™ RS416 Family Installation Guide rev118
2.3 Dielectric Strength (HIPOT) Testing
For dielectric strength (HIPOT) testing in the field, users must remove the metal jumper
located on terminal 2, 4, and 6 of the power supply terminal block. This metal jumper
connects transient suppression circuitry to chassis ground and must be removed in order
to avoid damage to transient suppression circuitry during HIPOT testing.
shows the proper HIPOT test connections and should be followed to avoid damage to
the device.
Figure 14: Dielectric Strength (HIPOT) Testing