Installation, Regency, Combustible mantel clearances – Regency Panorama P36D User Manual
Page 12
FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
12
Drywall
12"
Mantel
7
1/2"
Mantel
3
1/2"
Mantel
Mantel
Clearances
with
Flush
Glass
/
Full
Screen
Doors
14"
7"
10"
30-1/2"
to
floor
2
0
12
6
4
8
10
2
0
12
6
16
4
14
8
10
Side
V
iew
To
p
o
f
Unit
30-1/2"
to
floor
2
0
12
6
4
8
10
12"
Mantel
7
3/4“
Mantel
3
1/2"
Mantel
Mantel
Clearances
with
Bay
Option
13"
2
0
12
6
16
4
14
8
10
Drywall
To
p
o
f
Unit
7"
10"
Side
V
iew
6" Standoff
6" Standoff
6" Standoff
30-1/2"
to
floor
Side
V
iew
To
p
o
f
Unit
Barcelona
Front
Durok, Wonderboard or other
non-combustiblematerial
(cement board
12"
Mantel
7
1/2"
Mantel
3
1/2"
Mantel
17"
8"
12"
2
0
12
6
4
8
10
2
0
12
6
16
4
14
8
18
10
Mantel
Clearances
with
Flush
Glass
&
Barcelona
Front
Steel Stud
Header.
Because of the extreme heat this
fi
replace emits, the mantel clearances are critical.
Combustible mantel clearances from top of unit are shown in Diagrams 1, 2, & 3.
REGENCY
®
COMBUSTIBLE MANTEL
CLEARANCES
These drawings are to scale at 1:6 (one inch = 6 inches)
Mantel can be installed anywhere in shaded area or higher using the above scale.
Note:
Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour
.
Note:
A
non-combustible mantel may be installed at a lower height if the framing
is made of metal studs covered with a non-combustible board.
Diagram 1
Diagram 2
Diagram 3
INSTALLATION