Installation, Clearances – Regency Panorama P36D User Manual
Page 10
FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
10
INSTALLATION
The HeatWave Duct Kit and the Heat
Release Kit have different clearance
and framing requirements, check the
HeatWave and Heat Release manual
for details.
Heat Release Kit
The clearances listed below are Minimum distances unless otherwise stated:
A major cause of chimney related fi res is failure to maintain required clearances (air space) to combustible materials. It is of the greatest
importance that this fi replace and vent system be installed only in accordance with these instructions.
Clearance to Combustibles from:
Back
0"
(0mm)
Side
0"
(0mm)
Floor
0"
(0mm)
NOTE: The minimum fl oor clearance must be maintained from the top surface of the carpeting, tile, etc.
Minimum Clearance from Top of Unit to:
Ceiling
from top of unit.
32" (1016mm)
Side Wall Clearances:
Bay or Flush Front 6"*
(152mm)
Barcelona
Front
6"*
(152mm)
Hampton Cast Faceplate
6"*
(152mm)
Kensington Front
6"*
(152mm)
Balmoral Front
6"*
(152mm)
Full Screen Doors
6"*
(152mm)
* Measured from Surround or Front. See Regency
®
Clearances section for dimensions.
Horizontal Vent Clearances:
Top
2"
(51mm)
Side
1-1/2"
(38mm)
Bottom
1-1/2"
(38mm)
Vertical Vent Clearances
1-1/4"
(32mm)
Alcove Clearances**:
Max.
Depth
36"
(914mm)
Min.
Width
48"
(1219mm)
Min.
Height
72"
(1829mm)
**Approved for one sidewall installation only when using Barcelona Front.
WARNING: Fire hazard is an extreme risk if these clearances are not adhered to.
CLEARANCES
Barcelona with Double Screen Door Installations
To install the combination of the Barcelona front and screen
doors you must use non-combustible mantel in conjunction with
the already required framing specs for the Barcelona front.
Steel studs and non-combustible material on the facing must be
adhered to.
IMPORTANT: See Barcelona Series Framing Note for framing notes on Barcelona
Series Fronts.