Step 4. connect the cables, Step 4. connect the cables -6 – National Instruments GPIB-BUF User Manual
Page 21
Installation and Operation
Chapter 2
GPIB-BUF User Manual
2-6
© National Instruments Corp.
Table 2-2. Configuration Parameters for Switches 4 through 8 (Continued)
Switches
4
5
6
7
8
Indication
ON
OFF
ON
OFF
OFF
Sets GPIB primary address 20
ON
OFF
ON
OFF
ON
Sets GPIB primary address 21
ON
OFF
ON
ON
OFF
Sets GPIB primary address 22
ON
OFF
ON
ON
ON
Sets GPIB primary address 23
ON
ON
OFF
OFF
OFF
Sets GPIB primary address 24
ON
ON
OFF
OFF
ON
Sets GPIB primary address 25
ON
ON
OFF
ON
OFF
Sets GPIB primary address 26
ON
ON
OFF
ON
ON
Sets GPIB primary address 27
ON
ON
ON
OFF
OFF
Sets GPIB primary address 28
ON
ON
ON
OFF
ON
Sets GPIB primary address 29
ON
ON
ON
ON
OFF
Sets GPIB primary address 30
ON
ON
ON
ON
ON
Sets listen-only operation
Step 4. Connect the Cables
Connect the cables as follows:
1.
Connect the power jack of the wall-mount power supply to the power
receptacle on the back panel of the GPIB-BUF, then plug the supply
into an AC outlet of the correct voltage.
2.
Connect a GPIB cable from the target device to the GPIB OUT port on
the rear panel of the GPIB-BUF.
3.
Connect another GPIB cable from the GPIB IN port on the rear panel
of the GPIB-BUF to the remaining GPIB devices in your system.
Note:
In steps 2 and 3, be sure to obey all IEEE 488 cabling
restrictions, and tighten all lock screws on the GPIB connectors.