Chapter 2 installation and operation, Figure 2-1. gpib-buf system setup example, Figure 2-1. gpib-buf system setup example -1 – National Instruments GPIB-BUF User Manual
Page 16
© National Instruments Corp.
2-1
GPIB-BUF User Manual
Chapter 2
Installation and Operation
This chapter describes the procedures for installing and operating the
GPIB -BUF.
Figure 2-1 shows an example of a GPIB-BUF connected to a GPIB system.
This example shows a GPIB-BUF placed in a GPIB system with a GPIB
Talker/Controller, such as an IBM-PC with a National Instruments
GPIB -PCII Controller board installed, and a slow GPIB data acceptor, such
as an HP 7475A Color Plotter. Notice that the GPIB-BUF is placed in-line
between the existing GPIB system and the GPIB target device.
GPIB Cable
GPIB-BUF
IEEE 488
IEEE 488 BUFFER
POWER
READY
TALK
LISTEN
EMPTY
FULL
NATIONAL
INSTRUMENTS
®
GPIB Cable
Figure 2-1. GPIB-BUF System Setup Example