Installation, Step 1. inspect the gpib-buf, Step 2. verify the voltage requirement – National Instruments GPIB-BUF User Manual
Page 17: Installation -2
![background image](/manuals/194563/17/background.png)
Installation and Operation
Chapter 2
GPIB-BUF User Manual
2-2
© National Instruments Corp.
Installation
Install the GPIB-BUF according to the following procedure.
1.
Inspect the GPIB-BUF.
2.
Verify the voltage requirement.
3.
Configure th e operating parameters.
4.
Connect the cables.
5.
Power on the unit.
These steps are described in more detail in the following subsections.
Step 1. Inspect the GPIB-BUF
Before you install the GPIB-BUF, inspect the shipping container and its
contents for damage. If damage appears to have been caused in shipment,
file a claim with the carrier. Retain the packing material for possible
inspection and/or reshipment.
If the equipment appears to be damaged, do not attempt to operate it.
Contact National Instruments for instructions.
Step 2. Verify the Voltage Requirement
The GPIB-BUF is shipped from the factory with either a 115 V or 230 V
wall-mount power supply.
Verify that the voltage on the power supply matches the voltage that is
supplied in your area.
Warning:
Operating the unit at any voltage other than the one specified
could damage the unit.