beautypg.com

Installation, Unpack the iolink router, Select a site – Perle Systems IOLINK-520 User Manual

Page 11: 1installation

background image

IOLINK-520 & IOLINK-PRO Installation & Applications Guide — 1.1

1

Installation

The IOLINK-520 & IOLINK-PRO are flexible Ethernet Bridge/Routers that may be

configured to service Local Area Networks and Wide Area Network connections over leased

lines, ISDN circuits, and frame relay permanent virtual circuits. The IOLINK-PRO

supports a single LAN and one or two WAN links (one ISDN BRI interface or two other

WAN modules). The IOLINK-520 supports two independent LANs plus one WAN

interface or a single LAN plus two WAN interface modules (if two ISDN BRI modules are

installed, this will provide 4 WAN links)

PPP ISDN units provide bridging, IP/IPX routing, and compression over a PPP ISDN

connection and support an ISDN BRI interface via an integral ISDN-ST or ISDN-U link

module. The ISDN BRI interface supports two 64 Kbps B-channels.

PPP Lease line units provide bridging, IP/IPX routing, and compression and support one

or two physical wide area network (WAN) links that may operate at speeds up to 2.048

Mbps.

Frame Relay units provide bridging and IP/IPX routing and support 1 to 128 Permanent

Virtual Circuit (PVC) across two physical wide area links running RAW 1490 or

encapsulated PPP.

The following instructions provide a quick set-up guide for installation of the IOLINK-520

& IOLINK-PRO Ethernet Bridge/Routers:

Unpack the IOLINK Router

Rough handling during shipment can damage electronic equipment. As you unpack the

bridge/router, carefully check for signs of damage. If damage is suspected, contact the

shipper. Save the box and all packing material to protect the bridge/router should it ever

need to be moved or returned for service.

Check the packing slip that identifies the components and the LAN connector.

Select a Site

Place the bridge/router in a well ventilated area. The site should maintain normal office

temperature and humidity levels. Air vents located on the sides of the bridge/router must

have approximately one inch / 2.5 centimeters of clearance from any object.