Vtrak installation task list, Step 1: unpacking the vtrak – Promise Technology VTrak copy VTM210 User Manual

Page 2

background image

VTrak M610i, M310i, M210i Quick Start Guide

2

VTrak Installation Task List

Step 1: Unpacking the VTrak (below)
Step 2: Mounting VTrak in a Rack (page 5)
Step 3: Installing Disk Drives (page 10)
Step 4: Making Management and Data Connections
Step 5: Making Serial Cable Connections (page 15)
Step 6: Connecting the Power (page 16)
Step 7: Setting the IP Address (page 18)
Step 8: Creating Disk Arrays with WebPAM PROe (page 24)

For complete information about your VTrak E310f/s subsystem, see the VTrak
M610i, M310i, M210i Product Manual
on the CD.

Step 1: Unpacking the VTrak

The VTrak box contains the following items:

VTrak Unit

Quick Start Guide

Null Modem Cable

Left and right center-mount
brackets

Left and right mounting rails

Screws for disk drives
(36 for M210i; 52 for M310i; 70 for
M610i; including 4 spares)

1.5m (4.9 ft) Power cords (2 for US
and 2 for Europe)

CD with SNMP files, Product
Manual
and Quick Start Guide

Warning

The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.

Important

Use the following categories of network cables with VTrak:

Cat 6, preferred

Cat 5E, minimum