beautypg.com

Getting started, Physical installation, Required tools and materials – Polycom V2IU 4350 User Manual

Page 13: 2 getting started –1

background image

2 - 1

2

Getting Started

Physical Installation

The V

2

IU 4350 is designed for desktop, rack or wall-mount installation. Please

observe the following guidelines when installing the system:

Never assume that the AC cord is disconnected from a power source.

Always check first.

Always connect the AC power cord to a properly grounded AC outlet to

avoid damage to the system or injury.

Ensure that the physical location of the installation has adequate air circulation

and meets the minimum operating conditions as provided in the

environmental specifications for the system.

Required Tools and Materials

The following items are required:

If the unit is to be mounted on the wall:

1 Flat or Phillips screw driver
2 round or flat head Phillips or slotted screws - 1 ½ inch long
2 hollow wall anchors

If the unit will be mounted in a shelf:

1 Flat or Phillips screw driver

Warning

Secure the power supply using a fastener or nearby shelf so that it does not hang
from the power connector.