beautypg.com

Pumping down – LG LA121HPMI User Manual

Page 44

background image

44 Room Air Conditioner

Troubleshooting Guide

• Procedure

(1) Confirm that both the 2-way and 3-way

valves are set to the open position.
– Remove the valve stem caps and confirm

that the valve stems are in the raised posi-
tion.

– Be sure to use a hexagonal wrench to

operate the valve stems.

(2) Operate the unit for 10 to 15 minutes.

(3) Stop operation and wait for 3 minutes,

then connect the charge set to the service
port of the 3-way valve.
– Connect the charge hose with the push pin

to the service port.

(4) Air purging of the charge hose.

– Open the low-pressure valve on the charge

set slightly to air purge from the charge
hose.

(5) Set the 2-way valve to the closed position.

(6) Operate the air conditioner at the cooling

cycle and stop it when the gauge indi-
cates 1kg/cm

2

g.

(7) Immediately set the 3-way valve to the

closed position.
– Do this quickly so that the gauge ends up

indicating 3 to 5kg/cm

2

g.

(8) Disconnect the charge set, and mount the

2-way and 3-way valve’s stem nuts and
the service port nut.
– Use torque wrench to tighten the service

port nut to a torque of 1.8 kg.m.

– Be sure to check for gas leakage.

Lo

Closed

Purge the air

Outdoor unit

Indoor unit

Liquid side

Gas side

CLOSE

Open

2-Way
valve

3-Way
valve

CLOSE

Pumping Down

Do not use the existing charge set for R-22.
It is necessary to use new charge set for R-
410A. The pressure of R-410A is 1.6 times
higher than that of R-22. Thus, the high pres-
sure side gauge of charge set should be used
higher pressure gauge of 50kg/cm

2

range.

This manual is related to the following products: