beautypg.com

Caution – LG LA121HPMI User Manual

Page 26

background image

26 Room Air Conditioner

After the confirmation of the above conditions, prepare the wiring as follows:
1) Never fail to have an individual power circuit specifically for the air conditioner. As for the

method of wiring, be guided by the circuit diagram posted on the inside of control cover.

2) The screw which fasten the wiring in the casing of electrical fittings are liable to come

loose from vibrations to which the unit is subjected during the course of transportation.
Check them and make sure that they are all tightly fastened. (If they are loose, it could
cause burn-out of the wires.)

3) Specification of power source.
4) Confirm that electrical capacity is sufficient.
5) Confirm that the starting voltage is maintained at more than 90 percent of the rated volt-

age marked on the name plate.

6) Confirm that the cable thickness is as specified in the power source specification.

(Particularly note the relation between cable length and thickness.

7) Always install an GFCI circuit breaker in a wet or moist area.
8) The following would be caused by voltage drop.

• Vibration of a magnetic switch, which will damage the contact point, open fuse, disturbance of the normal

function of the overload.

9) The means for disconnection from a power supply shall be incorporated in the fixed

wiring and have an air gap contact separation of at least 3mm(0.12in) in each
active(phase) conductors.

CAUTION

1. Front panel opening

Hold the two ends of the front panel at the
bottom and move it upward.

2. Front panel closing

Move the link upward and close the front
panel.

3. Front panel removing

Raise the link up to hook hanger and
remove front panel forward.

How to use the front panel

Front panel

Installation

This manual is related to the following products: