beautypg.com

Flaring work, Cut the pipes and the cable, Burrs removal – LG LA121HPMI User Manual

Page 18: Putting nut on

background image

18 Room Air Conditioner

Flaring Work

Cut the pipes and the cable.

1. Use the piping kit accessory or the pipes purchased

locally.

2. Measure the distance between the indoor and the out-

door unit.

3. Cut the pipes a little longer than measured distance.
4. Cut the cable 1.5m(59.1in) longer than the pipe length.

Burrs removal

1. Completely remove all burrs from the cut cross section

of pipe/tube.

2. Put the end of the copper tube/pipe in a downward

direction as you remove burrs in order to avoid drop-
ping burrs into the tubing.

Putting nut on

• Remove flare nuts attached to indoor and outdoor unit,

then put them on pipe/tube having completed burr
removal.
(not possible to put them on after flaring work)

Flaring work

• Carry out flaring work using flaring tool as shown below.

Main cause for gas leakage is due to defect in flaring work. Carry out correct flaring work in the follow-
ing procedure.

mm

inch

mm

inch

Ш6.35

1/4

1.1~1.3

0.043~0.051

Ш9.52

3/8

1.5~1.7

0.059~0.066

Ш12.7

1/2

1.6~1.8

0.063~0.070

Ш15.88

5/8

1.6~1.8

0.063~0.070

Ш19.05

3/4

1.9~2.1

0.074~0.082

Outside diameter

A

Bar

Copper pipe

Clamp handle

Red arrow mark

Cone

Yoke

Handle

Bar

"A"

Pipe

Reamer

Point down

Copper

pipe

90

°

Slanted Uneven Rough

Firmly hold copper pipe in a die in the dimen-
sion shown in the table above.

Flare nut

Copper tube

Installation

This manual is related to the following products: