Unloading – Liebert Nfinity 208 V / 240 V 60Hz User Manual
Page 14

12
Unloading the UPS
CAUTION: This UPS is very heavy (see weight
on previous page). At least two people should
be present to unload it off of the pallet.
1. Once the UPS is near the desired operating
location, remove the cardboard cover.
2. Use a ratchet (1/2” or 13mm) or open-ended
wrench to remove the four mounting bolts
from the pallet brackets. Remove mounting
brackets from the pallet and UPS. Keep
brackets for future transportation of UPS, or
for additional stability once in place.
3. Remove the metal ramp from the bottom of
the UPS, rotating it. Fit ramp in pallet slot as
shown above.
4. Using two people, slowly move the UPS
down the ramp until the UPS is on level
ground.
Unloading
See also other documents in the category Liebert Tools:
- PS250-50S (12 pages)
- SGH STEAM SL-14050 (16 pages)
- Ship-Ahead Input/Output Cabinet NXL (20 pages)
- NfinityTM (44 pages)
- 4000 (59 pages)
- 230V (40 pages)
- PSP (32 pages)
- UPStation GXT (20 pages)
- UPSTATION GXT 2U (38 pages)
- UPS Systems PSI XR (32 pages)
- 600TTM (91 pages)
- Series 600T (128 pages)
- GXT2 - 3X1 (42 pages)
- Nfinity (44 pages)
- PowerSure PSA 350VA to 1000VA (8 pages)
- 2U (16 pages)
- PDUTM (156 pages)
- GXT2-6000 RT208 (52 pages)
- PowerSure Personal (12 pages)
- 2700VA (40 pages)
- Series 610 (44 pages)
- Emerson NX UPS System (88 pages)
- GXT 2U (44 pages)
- UPStation S VM12000 (38 pages)
- 1000kVA (120 pages)
- UPS (28 pages)
- UPS System (121 pages)
- PowerSure PSI 1000 - 3000VA 60 Hz 120V (36 pages)
- GXT2-4500RT230 (40 pages)
- GXT2-6000RTL630 (44 pages)
- IntelliRack (2 pages)
- PowerSure PSA 350-1000VA (2 pages)
- 350-700 VA (11 pages)
- 500-650 VA (24 pages)
- PowerSure PS250-60S (13 pages)
- 130 kVA (102 pages)
- 30-130kVA (112 pages)
- GXT (23 pages)
- PSITM (34 pages)
- 600T (73 pages)
- 600T (88 pages)
- 610 (104 pages)
- GXTTM (30 pages)
- 700-3000 VA (30 pages)