beautypg.com

Field wiring, Installation must comply with, Line voltage connections – Lochinvar KNIGHT 399 - 800 User Manual

Page 45: Installation & operation manual

background image

Installation & Operation Manual

45

8

Field wiring

ELECTRICAL SHOCK HAZARD – For
your safety, turn off electrical power
supply before making any electrical
connections to avoid possible electric
shock hazard. Failure to do so can cause
severe personal injury or death.

Wiring must be N.E.C. Class 1.

If original wiring as supplied with boiler
must be replaced, use only type 105°C
wire or equivalent.

Boiler must be electrically grounded as
required by National Electrical Code
ANSI/NFPA 70 – latest edition.

Installation must comply with:

1. National Electrical Code and any other national, state,

provincial, or local codes, or regulations.

2. In Canada, CSA C22.1 Canadian Electrical Code Part 1, and

any local codes.

Line voltage connections

1. Connect 120 VAC power wiring to the line voltage terminal

strip in the junction box, as shown in FIG. 8-1.

2. Provide and install a fused disconnect or service switch

(15 amp recommended) as required by the code (see
FIG. 8-1).

3. When connecting a domestic hot water (DHW) pump,

connect the wiring to the line voltage terminal strip as
shown in FIG. 8-1.

4. To activate a system pump, wire as shown in FIG. 8-1. Dry

contacts are sized for 1.5 hp/120V, 3 hp/240V or 30 amps.

GROUND

LINE

NEUTRAL

BK

G

W

BK

G

W

BK

G

W

BK

G

W

120V SUPPLY

L2/N

G

L1

SERVICE

SWITCH

SYSTEM

PUMP

BOILER

PUMP

DOMESTIC

HOT WATER

PUMP

Figure 8-1 Line Voltage Field Wiring Connections

Label all wires prior to disconnection
when servicing controls. Wiring errors
can cause improper and dangerous
operation.

ƽ WARNING

NOTICE

ƽ CAUTION