Content – Liebert GXT2 - 3X1 User Manual
Page 4

Content
Chapter 1 Introduction
1
1.1 Application
1
1.3 System Function Block
1
1.4 Features
2
Chapter 2 Installation
5
2.1 Unpacking Inspection
5
2.2 Outline and Panel Description
5
2.2.1 Outline
5
2.2.2 Front Panel
7
2.2.3 Rear Panel
8
2.3 Installation
8
2.3.1 Important Note
8
2.3.2 Installation Procedure
10
2.4 Connection of External Batteries
13
Chapter 3 Operation
17
3.1 Operating Mode
17
3.1.1 Normal Mode
17
3.1.2 Bypass Mode
18
3.1.3 Battery Mode
18
3.1.4 ECO Mode
19
3.1.5 Failure Mode
20
3.2 Operation
21
3.2.1 Startup and Initialization
21
3.2.2 Turn On the Inverter
22
3.2.3 Manual Battery Self-testing
24
3.2.4 Turn off the Inverter
25
3.2.5 Totally Shutdown the System
26
See also other documents in the category Liebert Tools:
- PS250-50S (12 pages)
- SGH STEAM SL-14050 (16 pages)
- Ship-Ahead Input/Output Cabinet NXL (20 pages)
- NfinityTM (44 pages)
- 4000 (59 pages)
- 230V (40 pages)
- PSP (32 pages)
- UPStation GXT (20 pages)
- UPSTATION GXT 2U (38 pages)
- UPS Systems PSI XR (32 pages)
- 600TTM (91 pages)
- Series 600T (128 pages)
- Nfinity (44 pages)
- PowerSure PSA 350VA to 1000VA (8 pages)
- 2U (16 pages)
- PDUTM (156 pages)
- GXT2-6000 RT208 (52 pages)
- PowerSure Personal (12 pages)
- 2700VA (40 pages)
- Series 610 (44 pages)
- Emerson NX UPS System (88 pages)
- GXT 2U (44 pages)
- UPStation S VM12000 (38 pages)
- 1000kVA (120 pages)
- Nfinity 208 V / 240 V 60Hz (45 pages)
- UPS (28 pages)
- UPS System (121 pages)
- PowerSure PSI 1000 - 3000VA 60 Hz 120V (36 pages)
- GXT2-4500RT230 (40 pages)
- GXT2-6000RTL630 (44 pages)
- IntelliRack (2 pages)
- PowerSure PSA 350-1000VA (2 pages)
- 350-700 VA (11 pages)
- 500-650 VA (24 pages)
- PowerSure PS250-60S (13 pages)
- 130 kVA (102 pages)
- 30-130kVA (112 pages)
- GXT (23 pages)
- PSITM (34 pages)
- 600T (73 pages)
- 600T (88 pages)
- 610 (104 pages)
- GXTTM (30 pages)
- 700-3000 VA (30 pages)