1. Solid Wall or Stud Partition
(Using Securing Brackets - Mounting off Front Face)

1.1 Remove the three securing screws and

remove the shower valve from the
building-in shroud (retain the screws
for later use).

1.2 Mark the position of the shower valve,

a cut out 150 x 170 mm (Max) is
required.
Note! Use a spirit level to make sure
that the hole cutout will be horizontal
and vertical.

1.3 Mark the routes for the hot and cold

supply pipework at 108 mm centres.
Falling Supplies: For falling supplies
remove the grubscrew on each elbow.
Remove the elbows and install on
opposite sides. Secure the elbows with
the grub screws.
Note! Make sure that the filter plugs
are positioned to the front (i.e.
hexagonal key facing forward).

1.4 Mark the route for the outlet pipework.

Note! For biv models the outlet elbow
should be sited above the control and
on the right or left, as site dictates.

1.5 Cut away the plasterboard or brick work

to a minimum depth of 58 mm to
accommodate the shower valve body,
the hot and cold supply pipework and
the outlet pipework.

1.6 Make sure that the building-in shroud

fits inside the hole cutout.

Outlet
Pipe BIR

Outlet Pipe BIV

Outlet Pipe BIV

Hot Inlet

Cold Inlet

Shower Control

6 mm Min
Finished Wall

24 mm Max
Finished Wall

58 mm Min

Finished Wall

170 mm Max

150 mm Max