beautypg.com

Sega WaveRunner GP User Manual

Page 48

background image

www.seuservice.com

39

In the SYSTEM TEST MODE, IC BD functioning can be checked, the monitor adjusted, and
the coin setting performed.
Refer to NAOMI SERIVCE MANUAL for the details. Note that the setting of the following
items need to be performed in accordance with the instruction given.

CABINET TYPE:

1PLAYER(S)

MONITOR TYPE:

HORIZONTAL

SERVICE TYPE:

COMMON

COIN CHUTE TYPE: COMMON

The SEQUENCE SETTING items of COIN ASSIGNMENTS are as follows.

SEQUENCE SETTING
SEQUENCE 1:

Number of credits required for starting the game.

SEQUENCE 2:

Number of credits required for continuing the play.

SEQUENCE 3 ~ 8:

NOT USED

9 - 2 SYSTEM TEST MODE

The contents of settings changed in the TEST mode are stored when the test
mode is finished from EXIT in the menu mode. If the power is turned off
before the TEST mode is finished, the contents of setting change become
ineffective.
Executing "BACKUP DATA CLEAR" in the SYSTEM TEST MODE does
not clear the BOOKKEEPING data in the GAME TEST mode.
Entering the TEST mode clears fractional number of coins less than one credit
and BONUS ADDER data.
Perform setting as per specified in this manual for operation. If setting not
specified is performed for operation, proper function of this product may not
be obtained.