Southbend HDG-60E User Manual
Heavy duty counterline, Operator’s manual
This manual is related to the following products:
Table of contents
Document Outline
- OPERATOR’S MANUAL
- Specifications
- Installation
- Step 1: Unpack
- Step 2: Attach Countertop Legs, Mount on Counter, or Mount on Stand
- Step 2a: Installation on Countertop Legs
- Step 2b: Installation Directly on a Non-Combustible Countertop Surface
- Step 2c: Installation on Insulated Base
- Step 2d: Installation on Floor Stand (24", 36", and 48" Models)
- Step 2e: Installation on Floor Stand (60" Models)
- Step 3: Attach Restraint for Appliances Mounted on Casters
- Step 4: Connect Gas Supply
- Step 5: Final Positioning, Clearance Check, and Ventilation Check
- Step 6: Check Pilot and Burner Operation
- Step 7: Final Installation Steps for Griddle Models
- Step 8: Final Installation Steps for Lava-Rock Charbroilers
- Operation
- Cleaning
- Adjustments
- Troubleshooting
- Parts