beautypg.com

Install the top track, Installer le rail supérieur – Sterling Plumbing Bypass Shower Doors 5400 Series User Manual

Page 15

background image

7.

Install the Top Track

NOTE:

The top track is designed so either side may be positioned facing outward

according to your preference.

Measure the distance from wall to wall above the wall jambs.
Mark the top track at the determined dimension.

NOTE:

For best results use a 32-teeth per inch hacksaw and miter box.

Cut the top track on the inside edge of the mark [approximately 1/32

″ (1 mm)

from the mark] to allow space for the top track to slide into place easily.
Carefully file the rough edges smooth where the top track was cut, taking care to

avoid damaging finished surfaces.
Position the top track over the wall jambs and gently push down.

Installer le rail supérieur

REMARQUE:

Le rail supérieur est conçu afin que chaque côté puisse être positionné

vers l’extérieur selon la préférence.

Mesurer la distance de mur à mur au-dessus des montants du mur.
Marquer le rail supérieur à la dimension déterminée.

REMARQUE:

Pour obtenir les meilleurs résultats possibles, utiliser une scie à métaux

à 32 dents par pouce et une boîte à onglets.

Couper le rail supérieur sur le rebord intérieur du repère [à approximativement

1/32

″ (1 mm) du repère] afin de laisser de l’espace pour permettre au rail

supérieur de glisser en place aisément.
Limer délicatement les rebords rugueux à l’endroit de découpe du rail supérieur

en évitant d’endommager les surfaces finies.
Positionner le rail supérieur sur les montants du mur et presser gentiment.

Top Track
Rail supérieur
Carril superior

Measure here.
Mesurer ici.
Mida aquí.

Sterling

15

1063216-2-L