9 hand-over to the operator, Hand-over to the operator – SMC Networks Sunny Mini Central SMC 5000A User Manual
Page 57
SMA
Technologie AG
Hand-over to the Operator
Installation Guide
SMC50A_60A-IEN073320
Page 57
9 Hand-over to the Operator
After installing the Sunny Mini Central successfully, hand the system over to the
operator. To do so, please use the following check list.
No.
Checkpoint
Control
What the operator should know:
1
operating principles of the PV system
2
switching the PV system on and off
3
meaning of the LEDs and display messages
4
maintenance and cleaning (handle covers, LEDs, display,...)
5
handling of additional communication components
6
contact partner in case of a failure
7
keep the documents to hand close to the Sunny Mini Central
The following documents are handed over to the operator:
1
operating manual of the Sunny Mini Central
2
installation guide of the Sunny Mini Central
3
declaration of conformity of the Sunny Mini Central
4
if necessary, all manuals for additional components (interfaces,
data logger, etc.)
5
data sheet for the solar modules used
6
diagram of the layout of the solar modules and their wiring
7
current circuit diagram of the unit
8
the complete registration and commissioning documents of the
local energy supply company