beautypg.com

Warning, Avertissement, Pre-installation steps – Superior SLBV-40PM User Manual

Page 8: Typical installation sequence, Detailed installation steps

background image

PRE-INSTALLATION STEPS

(Remove Glass Enclosure Panel)

The appliance is shipped with all gas controls

and components installed and pre-wired.

Note: Remove the glass enclosure panel

before installing the fireplace.

To remove the glass enclosure panel:

1. Remove the shipping carton, and then re-

move the shipping pad, exposing the front

glass panel.

2. Open the two latches securing the glass

panel (under the firebox floor).

3. Remove the glass panel by tilting it outward

at the bottom and lifting it up.

4. Set aside the glass enclosure panel in a

safe location to protect it from inadvertent

damage.

TYPICAL INSTALLATION

SEqUENCE

The typical sequence of installation is outlined

below, with page number references to the

related detailed instructions.

NOTE: Each installation is unique and may

result in variations to these steps.

Step 1. (Pages 8–10) Construct the appliance

framing.

Position the appliance within the

framing and secure with nailing

brackets.

IMPORTANT! Bend up the appropri-

ate top standoff spacers for the

drywall/finish material thickness to

be used (see Figure 7). Bend up the

outer pair for 1/2" ma terials and the

inner pair for 5/8" materials.

Bend up the outer pair for 1/2" ma-

terials and the inner pair for 5/8"

materials.

Bend out the appropriate nailing

flanges for the drywall/finish material

to be used.

Nailing flanges are provided for flush

framing, 1/2 inch and 5/8 inch fram-

ing depths (see Figure 7).

Step 2. (Page 11) Route the gas supply line

to the appliance location.

Step 3. (Page 11) Install the vent system and

exterior termination.

Step 4. (Page 12) Install field wiring.

a. Millivolt Appliances: Install the

operating control switch (not factory

provided).

b. Electronic Appliances: Field wire

and install operating control switch.

Step 5. (Page 14) [OPTIONAL]: Install

outside supplemental combustion

air kit.

Step 6. (Page 15) Make connection to gas

supply.

Step 7. (Page 16) Verify appliance operation.

Step 8. (Page 17) Install the logs, decorative

volcanic stone, and glowing embers.

Step 9. (Page 20) Install the glass enclosure

panel.

Step 10. (Page 20) Adjust burner air shutter

to ensure proper flame appearance.

Step 11. (Page 22) Perform spillage test.

Step 12. (Page 23) Install hood.

Step 13. (Page 23) Complete finished interior

wall.

Step 14. (Page 24) Attach "Safety-in-

Operation" warnings.

dETAILEd INSTALLATION STEPS

Step 1. Construct Appliance

framing

Frame the appliance as illustrated in Figures

8-1 and 8-2. All framing details must allow for

a minimum clearance to combustible framing

members as shown in Table 6, Page 7.

If the appliance is to be elevated above floor

level, a solid continuous platform must be

constructed below the appliance.

Headers may be in direct contact with the appli-

ance top standoff spacers when they are bent

up vertically, maintaining the 3" clearance to

the fireplace top, but must not be supported

by them or notched to fit around them. All

construction above the appliance must be

self-supporting. DO NOT use the appliance

for structural support.

Secure the fireplace to the side framing mem-

bers using the unit's nailing flanges — one top

and bottom on each side of the fireplace front.

See Figure 7. Use 8d nails or equivalent.

WARNING

failure to position the parts in

accordance with these diagrams

or failure to use only parts specifi-

cally approved with this appliance

may result in property damage or

personal injury.

AVERTISSEMENT

Risque de dommages ou de

blessures si les pièces ne sont

pas installées conformément à

ces schémas et ou si des pièces

autres que celles spécifiquement

approuvées avec cet appareil sont

utilisées.

Figure 7

Nailing flanges are

provided at all four

corners at 5/8", 1/2",

and flush settings.

Side

Framing

Fireplace

Nailing

Flanges

~

NOTE: The nailing flanges, combustible

members, and screw heads in areas directly

adjacent to the nailing flanges are EXEMPT

from the 1/2” clearance to combustible

requirements for the firebox outer wrapper.
Combustible framing may be in direct contact

with the nailing flanges and may be located

closer than 1/2” from screw heads and the

firebox wrapper in areas adjacent to the

nailing flanges.
Frame the opening to the exact dimensions

specified in the framing details in this manual.

fireplace secured to framing

by nailing flanges

(Left side front corner of fireplace shown.

Right side requirements are the same.)

SUPERIOR

®

B-VENT GAS FIREPLACES • MODELS SLBV-35, SLBV-40 • INSTALLATION INSTRUCTIONS

8

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

Control

Compartment

Panel

Hood

Glass

Door

Header

Spacing

Top

Standoffs

Flush

Nailing

Flange

1/2”

Nailing

Flange

5/8”

Nailing

Flange

Glass Door

Spring Latch

*IMPORTANT!

Bend up the

Top Standoff

Spacers before

installation.

Use outer pair

for 1/2" materials

and inner pair

for 5/8" materials.

Top

Standoff

Spacers*

Control

Compartment

Panel

Hood

Glass

Enclosure

Spring Latch

Panel

Lower

Enclosure Panel

Flush

Nailing

Flange

1/2"

Nailing

Flange

5/8"

Nailing

Flange

This manual is related to the following products: