Sanitation system layout, Installation, Docking platform riser – SeaLand 1 2500 Series User Manual
Page 3: Docking platform base
3
INSTALLATION
DOCKING PLATFORM RISER
1. The riser section of the docking platform is
mounted on a level floor using four screws (not
supplied). The floor must be strong enough
to support the weight of the cassette when full
(about 40 lbs. – 18 kg).
ATTENTION
The riser and base sections
must be assembled on the
same level surface.
DOCKING PLATFORM BASE
1. The base section of the docking platform is at-
tached to the riser. The base has two tabs (A)
that must be pushed into the respective slots
in the rear wall of the riser. Make sure that the
connection (B) for the carbon filter fits into the
space provided.
2. The ventilation hose (C) is routed out the side of
the base. Using barbed hose adapter provided,
route reinforced 5/8-inch (16mm) vent hose (not
supplied) to an outside vent fitting.
3. Fasten the base of the docking platform to the
surface (D).
BACK
FRONT
A
A
B
D
Make sure that the carbon
filter fits into the space
provided (B) and is
properly connected at
both ends.
SANITATION SYSTEM LAYOUT
SYSTEM GUIDELINES
1. Cassette vacuum tank must be
used with VacuFlush toilet.
2. VacuFlush toilet must be
connected to pressurized
water supply (not shown).
3. Centerline of toilet base must
be 11 inches (279 mm) from
back wall.
4. 5/8-inch (16mm) ID vent hose
must be attached to vent fitting
(not included).
C