beautypg.com

Installation, Preparation of monitor bottle – Sanyo MBR-704G User Manual

Page 14

background image

13

INSTALLATION

Preparation of monitor bottle

Prior to the operation of the unit, fill the monitor

bottles (upper and lower) with 10% glycerol (or other

solution such as ethylene glycol) using the following

procedure:

1. Remove the top and bottom drawer (or shelf).

2. Remove the monitor bottle cover as shown in the

figure.

3. Detach the sensor from the monitor bottle.

4. Pull up the bottle to take it out.

5. Pour 200ml of 10% glycerol (or other solution) into

the monitor bottle after removing the cap as shown

in the figure.

6. Cap the monitor bottle and return the bottle to its

original position.

7. Attach the sensor to the bottle and replace the cover

on the bottle.

loosen

2

3

4

4

This manual is related to the following products: