Chapter 2: Server Installation

2-1

Chapter 2

Server Installation

2-1 Overview

This chapter provides a quick setup checklist to get your AS1020C-3 system up and

running. Following these steps in the order given should enable you to have the

system operational within a minimum amount of time. This quick setup assumes that

your 1020C-3 system has come to you with the processors and memory preinstalled.

If your system is not already fully integrated with a serverboard, processors, system

memory etc., please turn to the chapter or section noted in each step for details on

installing specifi c components.

2-2 Unpacking

the

System

You should inspect the box the 1020C-3 was shipped in and note if it was damaged

in any way. If the server itself shows damage you should fi le a damage claim with

the carrier who delivered it.

Decide on a suitable location for the rack unit that will hold the 1020C-3. It should

be situated in a clean, dust-free area that is well ventilated. Avoid areas where

heat, electrical noise and electromagnetic fi elds are generated. You will also need

it placed near a grounded power outlet. Read the Rack and Server Precautions in

the next section.

2-3 Preparing for Setup

The box the 1020C-3 was shipped in should include two sets of rail assemblies, two

rail mounting brackets and the mounting screws you will need to install the system

into the rack. Follow the steps in the order given to complete the installation process

in a minimum amount of time. Please read this section in its entirety before you

begin the installation procedure outlined in the sections that follow.