beautypg.com

8 bring-up sequence (and stop) times – IBM C2B 2.25 Brick On Sled carrier 128-pin HPC User Manual

Page 36

background image

USER RESPONSIBLE F O R V E R I F Y I N G VERSION A N D COMPLETENESS

O E M F U N C T I O N A L SPECIFICATION ULTRASTAR X P (DFHC) SSA M O D E L S 1.12/2.25 GB - 1.0" H I G H

2.2.8 Bring-up Sequence (and Stop) Times

Figure 10. Start Time Diagram

Note:

BATS is the abbreviation for Basic Assurance Tests. Start-up sequence spins up the spindle motor,

initializes the servo subsystem, up-loads code, performs BATS2 (verifies read/write hardware), resumes
"Reassign in Progress" operations, and more. For more information on the start-up sequence, refer to the
Ultrastar XP ( D F H C ) S S A Models Interface Specification.

Note:

If a RESET is issued before the drive comes ready, the power on sequence will start again.

In all

other cases when a RESET is issued the present state of the motor is not altered.

Note: Reference “Start/Stop Unit Time” on page 49 for additional details.

Note:

See 5.7, “Spindle Synchronization” on page 69 for details about Start-up time increases when the

device is requested via Mode Parameters to synchronize the spindle motor to another device.

Table 3. Bring-up Sequence Times and Stop Time for C1x Models

Event

Nominal

Maximum

Notes

Power-up

1.5 sec

2.0 sec

*see Figure 10

Start-up

12.4 sec

45 sec.

*see Figure 10

Spin-up

8.2 sec

29.2 sec

*see Figure 10

Spindle Stop

6.0 sec

12.0 sec

Source filename=BRINGUP

IBM Corporation

Page 36 of 87