2.2.8 Bring-up Sequence (and Stop) Times
Figure 10. Start Time Diagram
Note:
BATS is the abbreviation for Basic Assurance Tests. Start-up sequence spins up the spindle motor,
initializes the servo subsystem, up-loads code, performs BATS2 (verifies read/write hardware), resumes
"Reassign in Progress" operations, and more. For more information on the start-up sequence, refer to the
Ultrastar XP ( D F H C ) S S A Models Interface Specification.
Note:
If a RESET is issued before the drive comes ready, the power on sequence will start again.
In all
other cases when a RESET is issued the present state of the motor is not altered.
Note: Reference “Start/Stop Unit Time” on page 49 for additional details.
Note:
See 5.7, “Spindle Synchronization” on page 69 for details about Start-up time increases when the
device is requested via Mode Parameters to synchronize the spindle motor to another device.
Table 3. Bring-up Sequence Times and Stop Time for C1x Models
Event
Nominal
Maximum
Notes
Power-up
1.5 sec
2.0 sec
*see Figure 10
Start-up
12.4 sec
45 sec.
*see Figure 10
Spin-up
8.2 sec
29.2 sec
*see Figure 10
Spindle Stop
6.0 sec
12.0 sec