beautypg.com

Diagram 3 – Impex PWR SURGE User Manual

Page 7

background image

STEP 3 (See Diagram 3)

A.) Attach the Leg Developer (#15) to the bracket on the Leg Developer Holder (#16). Secure

it with an Axle (#24), two

¾” Washers (#44), and two M10 x 5/8” Allen Bolts (#38).

B.) Insert one Foam Roll Tube (#21) halfway through the holes on the Leg Developer Holder

(#16). Then insert two Foam Roll Tubes (#21) halfway through the holes on the Leg
Developer (#15). Push six Foam Rolls (#28) onto the Tubes from both sides. Plug six
Foam Roll End Caps (#36) to the ends. Slide the Olympic Sleeve (#27) onto the weight
post in front of the Leg Developer. Attach the Olympic Spring Clip (#29) to the Sleeve.

C.) NOTE: When using the decline position to do Ab exercise, place at least 30lbs of weights

on the post to hold down the Leg Developer.

DIAGRAM 3






6