Buccaneer gt, falcon gte, 2 ventilation, 3 assembly – IDEAL INDUSTRIES BUC5034 User Manual
Page 5: 4 levelling, Warning, Buccaneer gt falcon gte
Buccaneer GT, Falcon GTE
- Installation, Assembly & Servicing
5
INSTALLATION
2.
INSTALLING THE BOILER
2.1 Boiler Location
Sufficient space shall be left clear around the boiler.
The figure stated in metres in the drawings below are the minimum recommended dimensions for providing easy access around the
boiler.
Buccaneer GT
Falcon GTE
2.2 Ventilation
The location of air inlets in relation to the high ventilation openings
shall ensure that the air is renewed in the entire volume of the boiler
room. The ventilation shall comply with any applicable national or
local regulations.
2.3 Assembly
The upper section of the MLS 150 tank (only) is provided with marks
allowing precise positioning of IDEAL boilers from the Buccaneer
GT or Falcon GTE range (see leaflet provided with these units).
2.4 Levelling
Levelling of the unit is carried out using the 4 bolts H 10 x 20 (packed
in the instruction bag) screwed into the base.
WARNING
Please note that boilers installed in or close to
rooms in which the atmosphere is polluted with
chlorine or fluorine compounds may be subject
to high corrosion.
For example: hairdressing salons, industrial
premises (solvents), cooling equipment etc.
Boilers installed in such locations shall not be
covered by the warranty.
0.5
m
1030
1m
0.5
m
0.5
m
600
1357
BUC5001
17
BUC5002
L1
GTE
4/150 I
5/150 I
4/250 I
5/250 I
1180
1424
1537
1587
H
BUC5038