10 buccaneer gt, falcon gte, Assembly – IDEAL INDUSTRIES BUC5034 User Manual
Page 10
10
Buccaneer GT, Falcon GTE
- Installation, Assembly & Servicing
ASSEMBLY
2
Assembling the boiler onto the tank
-
Place the boiler on the tank so that it is
positioned on the first two marks on the
front of the tank.
-
Assemble the boiler as instructed in
views 3 - 13 of Buccaneer GT boiler
Assembly Instructions.
14
15
Assembling the tank front panel
-
Fit the tank front panel after inserting the thermometer bulb
in the thimble tube of the inspection plug of the tank.
3
/
4
" tubes
BUC5014
*
BUC5015
* Automatic bleeder
valve not supplied
Installing the pipes
-
Connect the pipes between boiler and tank (package
BH 46) - see the instructions on page13.
*7+#$