Buccaneer gt, falcon gte, 15 assembly 4.3 electrical connections, Warning – IDEAL INDUSTRIES BUC5034 User Manual
Page 15
Buccaneer GT, Falcon GTE
- Installation, Assembly & Servicing
15
ASSEMBLY
4.3 Electrical Connections
The electrical wiring has been carefully checked in the factory and
the internal connections of the control panel must not be modified
in any event.
The electrical connections of the boiler shall be made in compliance
with applicable standards and regulations in force.
The unit shall be powered by a circuit with an omnipole switch with
an opening distance greater than 3 mm.
The connecting cables may be brought inside the boiler through
the cut-outs provided in the cover of the boiler, which may be used
along with purchased cable channels.
Fasten the cables to the rear plate of the control panel by means of
the cable clamps (supplied in the instructions bag), after mounting
them on the plate.
The pump cable has a connector fitted. Discard the connector.
WARNING
VERY IMPORTANT: never place sensor cables
(extra low voltage) and 230 V power supply cables
in the same cable channel or duct.
All the connections shall be made to the connection strip provided
for that purpose outside the volume of the control panel.
4.4 Installation with MB1 Domestic Hot water
Priority and Regulation Mode
Fitting and Connecting the MB1 Module
Fit the MB1 module on the front of the control panel. Proceed as
follows:
1.
Remove the cover: cut the four fixing studs of the cover with
a knife and fold it outward.
2.
Install and connect the MB1 module as directed on pages
16-18.
BUC5020
Side - 230V
Connections
Side-Low Voltage
Connections (Sensor)
e.g.
Buccaneer GT
WARNING
Electrical connections shall be carried out by a
qualified professional only.
BUC5042
Refer to Boiler Assembly Instructions for Control Panel Installation