12 buccaneer gt, falcon gte, Assembly – IDEAL INDUSTRIES BUC5034 User Manual
Page 12
12
Buccaneer GT, Falcon GTE
- Installation, Assembly & Servicing
ASSEMBLY
37
39
38
Assemble the boiler as instructed in figures 1 - 16
Assembling the boiler on the hot water tank
-
Place the boiler on the tank if required with a handling
tool (if required).
-
Assembly the boiler as instructed in figures 17 - 33 of
boiler assembly instructions for Falcon GTE.
Installing the tubes
-
Connect the tubes between boiler and tank (package BH
46) as directed in the instructions on page 13.
Assembling the tank front panel
-
Insert the thermometer bulb in the thimble tube of the
inspection plug of the tank (For 250 litre system - separate
package BH 47) and fit the tank front panel.
*
BUC5017
*Automatic Bleeder
valve (not supplied)
*7+#&
BUC5041