beautypg.com

Vent installation – Monessen Hearth 6000DV User Manual

Page 27

background image

42D0200

27

9

1

/

2

"

9

1

/

2

"

VENT INSTALLATION

INSTALLATION FOR VERTICAL TERMINATION

1. Determine the route your vertical venting will take. If ceiling joist,

roof rafters or other framing will obstruct the venting system,

consider an offset. See Figure 35 to avoid cutting load bearing

members.

NOTE: Pay special attention to these installation instructions
for required clearances (air space) to combustibles when
passing through ceilings, walls, roofs, enclosures, attic
rafters, etc. Do not pack air spaces with insulation. Also
note maximum vertical rise of the venting system and any
maximum horizontal offset limitations. Offsets must fall
within the parameters shows in Figure 18, page 20.

2. Set fireplace in desired location. Drop a line plumb down from

the ceiling to the position of the flue exit. Mark the center point

where the vent will penetrate the ceiling. Drill a small locating

hole a this point.

Drop a plumb line from the inside of the roof to the ceiling locat-

ing hole in the ceiling. Mark the center point where the vent will

penetrate the roof. Drill a small locating hole at this point.

FLAT CEILING INSTALLATION

1. Cut a 9

1

/

2

" (241mm) square hole in the ceiling using the locating

hole as a center point The opening should be framed to 9

1

/

2

"x9

1

/

2

"

(241mm x 241mm) inside dimensions as shown in Figure 37

using framing lumber the same size as the ceiling joist. If the area

above the ceiling is an insulated ceiling or a room, nail firestop

from the top side. This prevents loose insulation from falling into

the required clearance space. See Figure 36. Otherwise, install

firestop below the framed hole.

2. Assemble the desired lengths of pipe and elbows necessary to

reach from the burner system flue up through the firestop. Be sure

pipe and elbow connections are fully twist-locked. See Figure

21, page 21.

3. Cut a hole in the roof using the locating hole as a center point.

(Cover any exposed open vent pipes before cutting hole in roof).

The 9

1

/

2

"x9

1/2

" (241mm x 241mm) hole must be measured on the

horizontal. Actual length may be larger depending on the pitch of

the roof. There must be a 1" minimum clearance from the vent

pipe to combustible materials. (Insulation should be considered

a combustible material) Frame the opening as shown in Figure

20 on page 21.

Figure 35 - Offset with Wall Strap and 45°

Elbows

Roof

Flashing

Wall

Strap

45° Elbows

Ceiling Firstop

Figure 36 - If area above is a room, install

firestop above framed hole as shown

Figure 37 - If area above is not a room, install

firestop below framed hole as shown

Continued on next page

Firestop

Nails

Nails

Firestop